Everything you need to configure and run the safety stock,
reorder point, EOQ and reordering policy calculators for Microsoft Dynamics 365
Business Central.
New here?
Start with Getting started — install,
permissions, the five setup values that matter, and calculating your first
item.
Guides
Getting started
Install, assign permissions, review the defaults and calculate your first item.
Setup reference
Every setup field, its default, and what changing it does.
Running the calculators
Per item, in bulk from the Item List, and on a nightly schedule.
Planning Worksheet
Preview current versus proposed values and apply only what you select.
Calculation log
Read the audit trail and set a retention policy.
Per-item controls
Exclude items from planning and override the service level per item.
Reference
Troubleshooting
Result codes, warnings, and what to do about each one.
FAQ
Formulas, methodology, data handling and scope.
How the app works, briefly
All four calculators read one shared statistics engine, so they agree on
what “demand” and “lead time” mean for a given item.
Demand is sales, netted against same-day returns, measured
across every calendar day in the history window. In manufacturing companies you
can also count production and assembly consumption, so purchased components are
planned from real usage rather than from sales they never appear in.
Lead time is resolved from purchase receipt history where it
exists — the only source that also yields variability — then from the item’s
Lead Time Calculation, then from a fallback you set. Safety stock and reorder
point always use the same resolution, so the two can never disagree.
Results are written to the standard item planning fields. There is no
parallel data model, and standard planning consumes them with no further
configuration.
Formulas
Safety stock, covering variability in both demand and lead time:
SS = Z × √( LT × σD² + D² × σLT² )
Reorder point:
ROP = (average daily demand × lead time) + safety stock
Economic order quantity, the Wilson formula:
EOQ = √( 2 × D × S / H )
Where D is annual demand, S the ordering cost and
H the annual holding cost per unit. Full derivations and the
reasoning behind the defaults are in the FAQ.
Still stuck?
Contact support — we answer
within 2 business days. The app is open source, so you can also read the
calculation code or raise an issue on
GitHub.
