The complete user guide for BOM Change Control for Microsoft Dynamics 365 Business Central: setup, the BOM Worksheet, approvals, costing, revisions and every other feature. This is the page Business Central opens when you select Help inside the app.
New here?
Start with Getting Started – it takes you through your first change from worksheet to approved BOM version.
Contents
- Overview
- Getting Started
- BOM Manager Role Center
- BOM Worksheet
- BOM Explosion
- Where-Used Analysis
- Cost Simulation
- Revision Control
- Configurable BOMs
- Approval Workflows
- Component Obsolescence
- Mass Component Replacement
- Phantom BOMs
- Routing Integration
- CAD/SolidWorks Import
- BOM Templates
- Setup and Configuration
- Permissions
- Support
- Version Information
Overview
BOM Change Control is a Bill of Materials management application for Microsoft Dynamics 365 Business Central, published by GMSOFT LIMITED. It extends the standard manufacturing module with a staged, auditable change process: every change to a Production BOM is drafted in a worksheet, costed, optionally approved, and only then written back to Business Central as a new BOM or a new BOM version.
Three rules hold everywhere in the application:
- A certified Production BOM is never modified in place. Every change becomes a new BOM version, or a new BOM, created with status Under Development. You certify it with the standard Business Central action when you are ready.
- Approval governs the worksheet. An approval request is linked to one exact worksheet scenario, so the change that is applied is the change that was approved.
- Everything is logged. Approval actions, applied changes, mass replacements, phantom flattening and CAD imports write to append-only logs that cannot be edited or deleted.
What the app gives you
- BOM Worksheet – stage, cost and track BOM changes before they touch the live Production BOM.
- Approval workflows – single- or multi-level approval with routing rules, approver chains of any length, delegation, reminders and escalation; use the built-in engine or the standard Business Central workflow engine.
- Revision control – snapshot history of every BOM version, with comparison and restore.
- Analytics – multi-level explosion with cost roll-up, where-used, BOM comparison and change impact analysis.
- Cost simulation – named what-if scenarios with side-by-side comparison.
- Templates – reusable BOM structures.
- Configurable BOMs – option groups, rules and a guided wizard that generates variant BOMs.
- Component lifecycle – obsolescence register, risk levels, alerts, substitutes and mass replacement.
- Phantom BOMs – phantom register, blow-through explosion and flattening.
- Routing analysis – component-to-operation pegging and actual-versus-standard performance.
- CAD and PDM import – Excel, CSV, XML and JSON exports from Inventor, Fusion 360, SOLIDWORKS PDM, Vault, Windchill, Teamcenter and others.
BOM Change Control runs on Business Central online, version 29 or later, and has no dependencies beyond the standard application. Because it builds on Production BOMs and routings, it requires the manufacturing functionality of the Premium edition.
Getting Started
BOM Change Control is distributed through Microsoft AppSource. Work through these steps in a sandbox before deploying to production.
- Install the extension. In Business Central open Extension Marketplace, or install from the AppSource listing. Locate BOM Change Control by GMSOFT LIMITED, choose Get it now and complete the guided installation.
- Assign permission sets. Give BOM engineers
GSO BOM Chg User, approversGSO BOM Chg Supervand administratorsGSO BOM Chg Admin. See Permissions below. - Open BOM Change Control Setup. Search with Alt+Q for BOM Change Control Setup, or use the Role Center navigation group Administration. Complete at least the Approval Workflow group.
- Check your number series. The install routine creates four number series and assigns them in the Numbering group. Routings and BOMs created from the worksheet also use Manufacturing Setup → Routing Nos. and Production BOM Nos., so those must be configured too.
- Switch to the BOM Manager Role Center. Search for BOM Manager with Alt+Q, or assign the BOM Manager profile to the user.
- Schedule background tasks. On the setup page choose Schedule Background Tasks to create the daily Job Queue entries for approval reminders and escalation, obsolescence alerts and the analytics retention purge.
Your first change, end to end
- Open a Production BOM card and choose BOM Worksheet in the BOM Change Control action group. The BOM is loaded into a fresh worksheet scenario.
- Edit quantities, add components with Insert Line, or remove lines. Costs recalculate as you go.
- Choose Compare with Original to review exactly what you changed and what it costs.
- Choose Submit for Approval. The scenario status becomes Pending Approval and its lines are frozen.
- The approver opens Pending BOM Approvals, uses View Changes to review the worksheet, and chooses Approve.
- Back on the worksheet, choose Finish and Save and pick Create New Version or Create New BOM. The scenario becomes Completed.
- Certify the new Under Development BOM version with the standard Business Central action.
BOM Manager Role Center
The BOM Manager Role Center is the home page for everyday BOM work. To switch to it, select the Settings icon in the top-right corner, choose My Settings, set the Role field to BOM Manager and choose OK.
Activity cues
The BOM Activities part shows live counts you can click through to the underlying list:
- BOMs & Components – Certified BOMs, In Development, Obsolete, High Risk, Pending Approval and Cost Scenarios.
- Approvals – My Pending, My Requests, Overdue and All Pending.
Navigation groups
| Group | Contains |
|---|---|
| BOM Management | Production BOMs, BOM Worksheets, BOM Worksheet, BOM Templates, Where-Used, BOM Explosion |
| Cost Analysis | Cost Simulation, Scenario Comparison, BOM Comparison, Change Impact Analysis, Routing Analysis |
| Version Control | BOM Revisions, Compare Revisions |
| Configurable BOMs | Configurable BOMs, Generated Instances, Configuration Wizard |
| Component Management | Mass Component Replace, Component Substitutes, Component Obsolescence, Phantom BOMs, Circular Reference Check |
| Import | CAD/PDM BOM Import, SolidWorks BOM Import, Import Log |
| Master Data | Items, Production BOMs, Routings |
| Approvals | Pending Approvals, My Approval Requests, Approval Audit Log |
| Administration | BOM Change Control Setup |
The New Production BOM, New BOM Template, New Cost Simulation, New Configurable BOM and Configure BOM actions are available directly from the Role Center.
BOM Worksheet
The worksheet is the staging area. Nothing you do here touches a live Production BOM until you choose Finish and Save. Each worksheet is a numbered scenario, and scenarios are private to the user who created them.
Opening a worksheet
- BOM Worksheets on the Role Center lists your scenarios, with Open Worksheet, New Worksheet and Delete Worksheet.
- BOM Worksheet on the Role Center opens a new scenario directly.
- On a Production BOM card, the BOM Worksheet action loads that BOM into a fresh scenario and opens it.
Loading and editing
| Action | What it does |
|---|---|
| Load BOM | Pick an item; its active Production BOM – the certified version effective today, or the header lines – is loaded at all levels. If the BOM has certified versions you can pick a specific one. If several items share the BOM you are asked which item is the parent. |
| Copy from Item / Apply Template | Alternative ways to populate the scenario. |
| Insert Line | Adds a blank top-level line after the selected line. Exploded child lines are read-only and cannot have lines inserted after them. |
| Create Semi-Finished Item | Turns the selected top-level line and its children into a new item with its own BOM. The wrapped lines are removed from the scenario so the parent does not double-count them. |
| Manage Routing / View Routing | Create a routing, numbered from Manufacturing Setup, or open the item’s existing routing. |
| Refresh Warnings | Re-checks every component for blocked items, missing cost, missing vendor and similar issues. Use the Show Warnings toggle to see only the lines that need attention. |
| Recalculate Costs | Recomputes the cost of every line in the scenario. |
| Clear Worksheet | Removes every line of the scenario. |
Editing a line recalculates Cost Amount as quantity × unit-of-measure factor × (1 + scrap %) × unit cost, where unit cost is per base unit. Changing the unit of measure recalculates the cost rather than locking the line. A worksheet started from scratch has an editable Parent Item No. until one is set; it is then carried to every line of the scenario.
Statuses
| Status | Meaning | What you can do |
|---|---|---|
| Open | Editable draft | Edit, load, clear, submit, or release when no approval is needed |
| Pending Approval | Submitted and linked to an approval request | Cancel the request, which returns the scenario to Open |
| Released | Approved, or approval not required | Finish and Save, or Reopen |
| Completed | Written to a Production BOM or version | Nothing – the scenario is closed |
Completed is new in version 2.0. While a scenario is Pending Approval, Released or Completed, no line can be added, loaded, cleared or edited by any page, tool or API.
Finishing the change
- If approval is required, choose Submit for Approval. When the request is approved, the scenario becomes Released.
- If approval is not required, choose Release.
- Choose Finish and Save, then pick Create New Version – a new version of the original BOM, optionally with a starting date – or Create New BOM, a new BOM assigned to the parent item. Both are created with status Under Development.
- The scenario becomes Completed. Finishing twice is not possible, so a change can never be written twice.
Version codes are numbered (“1”, “2”, … “10”, “11”), and you can type your own code in the completion dialog. Every BOM the app writes is checked for circular references first.
BOM Explosion
Open BOM Explosion from the Role Center, from a Production BOM card or from the worksheet. The explosion reads only the active version of each BOM – the certified version effective on the work date, or the header lines – and honours line starting and ending dates.
How to run an explosion
- Open BOM Explosion – Multi-Level.
- Choose Explode BOM and select the parent item.
- Set the level cap. Enter 0 for all levels; a hard internal limit protects against runaway structures.
- Review the result, then use Expand All, Collapse All, Filter by Level or Show Leaf Components Only to focus.
- Optionally switch on Show/Hide Availability, Show/Hide Routing and Show/Hide Lead Time.
- Use Copy to Worksheet to carry the structure into a worksheet scenario.
How the numbers work
- Quantity per Parent and Total Quantity per Top are shown in the line’s own unit of measure. Extended Cost converts to base units and applies scrap.
- Scrap compounds down the tree: 5 % scrap on a sub-assembly means 5 % more of everything below it.
- Rolled-Up Cost of an assembly is the sum of its children; a purchased part’s rolled-up cost is its extended cost. A sub-assembly’s own unit cost is not added on top. A sub-assembly appearing under several parents is costed once per occurrence.
- Production BOM-type lines, including flattened phantoms, are expanded in place rather than skipped.
- Explode with Phantom Blow-Through replaces registered phantom items with their components at the same level. When the phantom record has Include Phantom Cost switched on, the phantom’s own cost appears as an extra line.
Where-Used Analysis
BOM Where-Used Analysis answers the question that precedes every component change: which parents would this affect? The analysis was rewritten in version 2.0 and now uses the same active-version and costing rules as the explosion.
How to run it
- Open Where-Used from the Role Center, from a Production BOM card, or from a worksheet line.
- Enter the Component to Search.
- Switch Include All Levels on for indirect usage, or use Show Direct Usage Only for first-level parents.
- Choose Analyze Component.
- Use Show Certified Only to ignore work in progress, and Show Change Impact to classify the effect of changing the component.
What the results mean
- Only BOMs where the component appears in the active version are counted; superseded versions are ignored.
- Total Quantity Required is expressed in the searched component’s base unit per one unit of the parent, converting every level’s unit of measure and compounding scrap, including at level 1.
- A parent reachable through two different sub-assemblies – a diamond structure – is listed once per path, each with its own quantity.
- The BOM status column shows the real status of the BOM, such as Certified or Under Development, read from the standard Business Central enum.
- The summary shows Direct Usages, Indirect Usages, In Certified BOMs, In Development BOMs, Total Quantity Required and Total Cost Impact.
Results are private to the user who ran them and are purged after the number of days set in Analytics Retention Days.
Cost Simulation
BOM Cost Simulation lets you test cost, quantity and component changes without touching production data, and keep the good ones as named scenarios.
Building a scenario
- Open Cost Simulation from Cost Analysis on the Role Center.
- Choose Load from BOM. If your current worksheet scenario has lines, they are loaded and the simulation can later be applied back to them. Otherwise pick an item and its active Production BOM is loaded for analysis only.
- Set the Scenario Type: Cost Change, Quantity Change, Alternative Component, Volume Discount or Combined. The type controls which columns are editable.
- Enter the simulated values, or use Apply % Change to All. Reset to Current undoes your edits.
- Use Show/Hide Alternatives and the substitute actions to test approved substitutes, and Load Routing Scenario to add the routing cost side.
- Choose Save Scenario and give it a Scenario Name.
Comparing and applying
- Load Scenario and Delete Scenario manage saved what-ifs; the Saved Scenarios list is searchable from Tell Me.
- Compare Scenarios opens Scenario Comparison and shows them side by side.
- Apply to Worksheet writes the simulated quantities and costs back to the exact worksheet lines the simulation was loaded from. From there the normal change-control route applies.
Revision Control
BOM Revisions, under Version Control on the Role Center, is the snapshot history of your BOMs. A revision has a type – Initial, Minor Change, Major Change, ECO or Emergency – and a status of Draft, Pending Approval, Active, Superseded or Obsolete.
Working with revisions
- Choose Create Revision, either here or on the Production BOM card. It snapshots the version of the BOM that is in force today. Every change applied through approval also creates a revision automatically.
- Use Create Snapshot to re-capture the lines of a Draft revision. Once a revision is pending, active or superseded its snapshot is history and cannot be overwritten.
- Choose Activate to mark a revision active; it supersedes the previous active revision of the same BOM version. A revision linked to an approval request can only be activated once that request is approved.
- Choose Compare Revisions, or Compare with Previous on the revision card, to see added, removed and changed lines with their cost differences.
- From the revision card, Restore as New Version rebuilds the snapshot into a new Production BOM version and leaves the current data untouched. Restore (Replace Lines) overwrites the current lines and is not allowed on certified BOMs.
Cost Before and Cost After on a revision are measured against the previous revision, so the figure reflects the change itself, not the whole BOM.
Configurable BOMs
Configurable BOMs turn one base Production BOM into a family of variant BOMs driven by options and rules. Open Configurable BOMs from the Role Center.
Setting one up
- Create a Configurable BOM, point it at a Base Production BOM and mark it Active. Only active configurable BOMs can generate.
- Add Option Groups and set the selection type: Single Select, Multiple Select, Required Single or Optional. Optionally set minimum and maximum selections. Single Select and Required Single are enforced when generating, not only in the selector.
- Add Options within each group. An option can Add Component, Remove Component, Replace Component, Modify Quantity or Add Sub-BOM, and can carry price and lead-time adjustments.
- Add Rules of type Requires, Excludes, Implies or Quantity Dependency. Rules are evaluated in Priority order.
- Make sure Config BOM Nos. is filled in on the setup page – the wizard cannot generate without it.
Generating a variant
- Choose Configure BOM on the Role Center to start the BOM Configuration Wizard.
- Select the configurable BOM, then move to Select Options and make your selections.
- On the Review step check Base Cost, Options Cost, Total Cost and Estimated Lead Time, and optionally set Assign to Item No.
- Choose Generate BOM. The new BOM is numbered from Config BOM Nos. and created Under Development.
- Every generation is recorded under Generated Instances.
Approval Workflows
Approval always starts from a worksheet scenario. The worksheet-less Submit for Approval action that version 1.x offered on the Production BOM page was removed in version 2.0, so that the change that gets applied is always exactly the change that was reviewed.
For new installations, Approval Required for BOM Changes and Approval Required for New BOMs are switched on by default. A change-control product should not ship with change control switched off, so an administrator has to opt out explicitly in BOM Change Control Setup.
Submitting a change
- On the worksheet, choose Submit for Approval.
- The app computes the cost impact and component counts from the scenario, resolves the approver of every level and validates each one – the user must exist, must not be the requestor, and must differ from the previous level.
- The resolved approver sequence is stored on the request as a snapshot. Editing an approver rule or chain afterwards never strands or reroutes a request already in flight, and a gap in a chain is reported at submission rather than discovered at level 3.
- The request is linked to the scenario and the lines move to Pending Approval.
- If the cost impact is below Auto Approve if Cost Impact <, the request is approved and applied immediately, and is still written to the audit log.
- To withdraw, choose Cancel Approval Request; the lines return to Open.
Approving a change
Approvers work from Pending BOM Approvals – Pending Approvals on the Role Center, or Alt+Q for “Pending BOM Approvals”. The My Approvals, My Requests and Overdue filters narrow the list.
| Action | What happens |
|---|---|
| View Changes | Opens the linked worksheet in review mode. View Original BOM shows what it is being compared against. |
| Approve | A comment is optional. On a multi-level request the request moves to the next level’s approver. On the last level the change is applied: a new Under Development version of the BOM is created from the worksheet, a revision is snapshotted, and the worksheet is Released. |
| Reject | A reason is required. The worksheet returns to Open so the requestor can correct it and resubmit. |
| Delegate | Reassigns the current level to another user. Delegating to yourself, to the requestor, or to a user who already approved an earlier level of the same request is refused. |
| Cancel | Requestor only. The worksheet returns to Open. |
Only the assigned approver can act, and the requestor can never approve their own request, even as an administrator.
Multi-level approval and approver chains
- Multi-Level Approval Required in setup sends requests above Level 2 if Cost Impact > to a second, different approver.
- Approver Rules, an action on the setup page, routes requests to specific level 1 and level 2 approvers by item category and minimum cost impact band.
- A rule can carry a BOM Approver Chain of any length – levels 1, 2, 3 and so on, without gaps – which replaces the two-level scheme for the requests it matches.
- Escalate Overdue Approvals lets the background task reassign an overdue level-1 request to the level-2 approver, once.
Reminders, notifications and the audit log
- Approvers are notified by email. The in-app message shown after you submit is a confirmation to the sender, not a message to the approver.
- With Send Approval Notifications on and the background task scheduled, approvers of requests pending longer than Send Reminder After Days receive one reminder email. Send Reminders on the approvals list does the same on demand. A reminder counts as sent only when the email was actually delivered.
- BOM Approval Audit Log records every creation, submission, approval, rejection, delegation, cancellation, escalation and auto-approval with user, timestamp, cost impact and component counts. Entries cannot be changed or deleted.
Using the standard Business Central workflow engine
Set Approval Engine to Business Central Workflow in setup. The app ships a BOM change approval workflow template and an approver type called BOM Change Control Rules; enable a workflow from that template. Requests then appear on the standard Requests to Approve page, where you approve, reject and delegate as usual, with substitutes taken from Approval User Setup. The app still applies the change and writes its own audit log through the workflow responses, and reject, cancel and reopen return the worksheet to Open exactly as they do with the built-in engine.
Component Obsolescence
Component Obsolescence Tracking is the register of component lifecycle risk. Each record carries a Lifecycle Status – Active, Not Recommended, Last Time Buy, Obsolete or Discontinued – and a calculated Risk Level of None, Low, Medium, High or Critical, derived from status, end-of-life date, stock cover and the number of certified BOMs affected.
Populating and maintaining the register
- Choose Refresh from BOMs to add every component, purchased or manufactured, found in BOMs.
- Choose Refresh Inventory to update stock, usage and months of stock from item ledger entries. Zero stock with real usage counts as a shortage.
- Choose Calculate All Risks to re-evaluate risk levels against the current setup thresholds.
- Maintain the end-of-life and last-buy dates, the suggested Replacement item and the Action Required value on the obsolescence card.
Acting on a component
- Where-Used, View Item, Create Substitute and Mass Replace act on the selected component.
- Send Alert, Send Alerts (Selected) and Run Batch Alerts create notification entries and send email to the Alert Email Recipients.
- Automatic alerts fire when a record crosses a threshold, at most once per week per component.
- Show Critical Only and Show High Risk filter the list; Generate Risk Report produces the report.
Stopping obsolete parts at the source
The Obsolete Item Control setting – Warn, Block or None – decides what happens when a purchase line, requisition line or production order component references a tracked item. Warn suggests the replacement item; Block refuses Obsolete and Discontinued items outright. The Item Card also shows a lifecycle panel with status, risk level and replacement for tracked items.
Component substitutes
A substitute on BOM Component Substitutes links an original component to a replacement with a Quantity Ratio that must be greater than zero, plus a priority, a condition – Always Available, When Primary Unavailable, Customer Request or Cost Reduction – and validity dates.
With Approval Required for Substitutes switched on, a new substitute stays Draft until it is submitted and approved through its own flow, with its own auto-approve threshold. An approved substitute can no longer be edited except for its effective start and end dates, so it can be retired but not silently altered. Only approved substitutes inside their validity window are offered by Apply Substitute on the worksheet and in cost simulation.
Mass Component Replacement
Mass Component Replace swaps one component for another across many BOMs in a single operation.
- Open Mass Component Replace from the Role Center, from a worksheet or from an obsolescence record.
- Enter the Original Component No., the New Component No. and the Quantity Ratio.
- Choose Find Usage. Every BOM line using the component is listed with its BOM, parent item, current and new quantity and cost, and the cost difference.
- Review the preview and use the Include checkbox, or Select All and Deselect All, to choose which BOMs to update.
- Choose Execute Replace, or Run in Background for large selections.
Certified BOMs and certified versions are skipped rather than edited in place. Each line keeps its unit of measure when the new item has that unit; otherwise the quantity is converted to the new item’s base unit. Every replacement is written to the audit log and every touched BOM is re-checked for circular references.
Mass replacement updates the selected uncertified BOMs directly – it does not raise an approval request and it does not create a version. Where your change policy requires approval, make the change through a worksheet scenario instead.
Phantom BOMs
Open Phantom BOMs from the Role Center to register an item as a phantom. The item must have a Production BOM.
What you can do with a phantom
- Toggle Phantom Status registers or de-registers the item.
- Explode with Phantom Blow-Through and Preview Blow-Through show the parent structure with the phantom replaced by its components at the same level. Include Phantom Cost on the phantom record decides whether the phantom’s own cost appears as an extra line.
- Apply Flushing to Item writes backward flushing to the item, so standard manufacturing consumes the components without a separate order.
- Flatten into Parent BOMs converts item lines that reference the phantom into native Production BOM-type lines. Scrap, routing link codes and positions are preserved, certified parents are skipped, and a flatten that would create a loop is rolled back.
- Refresh Counts, View BOM, Where-Used and Open Item Card round out the card.
Routing Integration
BOM Routing Analysis, under Cost Analysis on the Role Center, connects the components of a BOM to the operations that consume them.
- Choose Analyze. Every component of the BOM’s active version is pegged to the operations of the item’s active routing version by routing link code, and time and cost are totalled.
- Review Time Analysis, Cost Analysis and Bottleneck Analysis. All times are normalised to minutes through each operation’s capacity unit of measure, so hours of setup and minutes of run time add up correctly; costs use the work or machine centre’s unit cost per its own capacity unit.
- Open the Operation Tree to see the BOM through the routing: each operation with its components, components that no operation consumes, and pegging problems such as an unknown link code, a duplicate link code, a phantom pegged to an operation or a subcontracted operation. The Routing Pegging Issues page lists each problem with a recommended fix.
- Open Routing Performance to compare posted capacity ledger entries with the routing standard per operation – run time, setup time and scrap – flagging anything beyond Routing Variance Threshold % over the Routing Analysis Period.
- Use Create Routing on an uncertified BOM to generate a starter routing: a preparation operation, one operation per component and a final assembly. Link codes are written to both the BOM lines and the operations, time units are taken from the work centre, and the routing is attached to the items that use the BOM. Adjust the operations afterwards.
- Sync Links refreshes the link table after routing changes.
CAD/SolidWorks Import
CAD/PDM BOM Import, under Import on the Role Center, brings engineering BOMs into Business Central. A separate, simpler SolidWorks BOM Import page handles SOLIDWORKS Excel and CSV exports.
Importing
- Choose the Source System: Autodesk Inventor, Autodesk Fusion 360, SOLIDWORKS PDM, Autodesk Vault, PTC Windchill, Siemens Teamcenter or Other. This selects the expected column names and the assembly detection rules.
- Import the file as Excel, CSV, XML or JSON. Excel uses the header row to find columns such as Part Number, Description, Quantity, Unit, Level, File Name and Revision. CSV uses the fixed column order
PartNo, Description, Qty, UOM, Level, Material, FileName, Revisionand understands quoted values. XML and JSON are parsed from the whole stream. Numbers parse regardless of the session’s decimal separator, and an unparseable date is left blank rather than aborting the import. - Review the staging list. Each row shows its mapped Item No., whether the item and BOM already exist, the parent part and the proposed Import Action: Create Item, Create BOM, Update BOM or Skip.
- Adjust rows with Set Action: Skip, Set Action: Create Item and Refresh Mapping.
- Choose Process Import.
How part numbers are matched
A part number is matched to an item by exact item number, after removing characters that item numbers do not allow, and then by an Item Reference whose Reference No. equals the raw part number, honouring the reference’s validity dates. There is no partial, wildcard or description matching, so unmatched rows get the action Create Item. Units of measure are matched by exact code, then by exact description, and otherwise fall back to the tenant’s default piece unit.
What Process Import does
The run makes three passes: create items, with base unit of measure and, for assemblies, Prod. Order replenishment; create BOMs for the new assemblies in the same run; and update existing BOMs. The rules are strict:
- Each row succeeds or fails on its own, so one bad row does not roll back the run. The error text appears on the row and in the import log.
- Before any existing BOM line is deleted, every child is verified: it exists, it is not blocked, and it would not close a loop.
- A BOM is only updated when it is not certified and belongs to a single item. A BOM shared by several items is refused rather than rewritten.
- A new assembly’s BOM is created Under Development and assigned to the item.
The CAD Import Log records every session, row and outcome, and its entries are immutable. CAD Import Errors shows the failures from a session; fix the underlying data and run Process Import again, and only the failed rows are retried.
BOM Templates
The BOM Template Library stores reusable BOM structures. Usage counts and last-used dates are tracked, so you can see which patterns your team actually relies on.
Creating a template
- Open BOM Templates from the Role Center.
- Choose Create from Existing BOM and pick a Production BOM, or Create from Worksheet to capture the scenario you are working on.
- Give the template a name and a category, and edit its lines on the template card.
Using a template
- Open a worksheet scenario with status Open – a template cannot be applied to a frozen scenario.
- Choose Apply Template on the worksheet, or Apply to Worksheet from the template library.
- Adjust the generated lines, then continue with the normal change-control route.
Duplicate Template, Export Template, Import Template, Delete Template, Filter by Category, Show Standard Templates Only and Show Most Used complete the library. You can also capture the current worksheet with Save as Template.
Setup and Configuration
Search for BOM Change Control Setup with Alt+Q, or open it from the Administration group on the Role Center. The page is organised in groups.
Numbering
| Field | What it controls |
|---|---|
| BOM Nos. | Number series for Production BOMs created by Finish and Save → Create New BOM. When blank, the standard Manufacturing Setup → Production BOM Nos. series is used. |
| Revision Nos. | Number series for BOM revisions. |
| Config BOM Nos. | Number series for BOMs generated by the configurator. Required before the wizard can generate. |
| Config Instance Nos. | Number series for configuration instances. |
Approval Workflow
| Field | What it controls |
|---|---|
| Approval Required for BOM Changes | Worksheet changes to an existing BOM need approval before they can be released. On by default for new installations. |
| Approval Required for New BOMs | Worksheets that create a new BOM need approval. On by default for new installations. |
| Approval Required for Deletion | Closing or deleting a BOM needs approval. |
| Require Approval if Cost Change > | Cost-impact threshold. A modification whose cost impact is at or below this amount does not need approval, even when components changed. Set it to 0 to require approval for every change. |
| Auto Approve if Cost Impact < | Requests below this absolute cost impact are approved automatically on submission, and are still logged. 0 disables auto-approval. |
| Default Approver ID | Approver used when no approver rule matches. Must not be the requestor. |
| Approval Due Days | Days from submission to the due date. |
| Approval Engine | BOM Change Control, this app’s own workflow, or Business Central Workflow, the standard engine. |
Multi-Level Approval
Multi-Level Approval Required, Level 2 if Cost Impact >, Level 2 Approver ID and Escalate Overdue Approvals govern the second level. The Approver Rules action opens the routing matrix, and each rule can carry an approver chain of any length.
Approval Email Notifications
Send Approval Notifications is the master switch. Send Email on Approval Request, Send Email on Approval and Send Email on Rejection control the individual messages, Approval Email CC adds semicolon-separated extra recipients, Send Reminder After Days drives the reminder task, and Use User Email from BC takes addresses from the Business Central user records. Email requires a configured account in Email Accounts and a default email scenario.
Substitute Approval
Approval Required for Substitutes and Auto Approve Substitute if Cost Diff < control the separate approval flow for component substitutes.
Alert thresholds, risk and automatic alerts
These groups drive component obsolescence. End of Life Warning (Months), Last Time Buy Warning (Days), Low Stock Warning (Months) and Critical Stock Warning (Months) decide when a component counts as approaching end of life or short of stock. High Risk if BOMs Affected >= and Critical Risk if BOMs Affected >= set how many certified BOMs make a component High or Critical risk. The Automatic Alerts group sends alerts when a record crosses a threshold, and the Notification Settings group chooses the delivery channels through Send Email Alerts, Alert Email Recipients and Create Notification Entries.
Impact, routing and retention
Impact High Risk BOM Count, Impact Medium Risk BOM Count, Impact High Risk Cost % and Impact Medium Risk Cost % classify Change Impact Analysis as Low, Medium or High; 0 is a valid, deliberate value that the app never overwrites. Routing Variance Threshold % and Routing Analysis Period govern Routing Performance, and Analytics Retention Days sets how long explosion, where-used and comparison results are kept per user.
Background tasks
Schedule Background Tasks creates three daily Job Queue entries, which you then manage in Job Queue Entries:
- Approval reminders and escalation of overdue level-1 requests.
- The component obsolescence alert sweep.
- The analytics retention purge.
Under the Business Central Workflow engine, reminders and overdue handling are done by the standard workflow instead.
Permissions
BOM Change Control ships four permission sets. Assign them to users from the standard permission pages.
| Permission set | For | What it allows |
|---|---|---|
BOM Change Control User (GSO BOM Chg User) |
BOM engineers | Everyday work: worksheets, analytics, cost simulation, templates, CAD import, revisions, and submitting changes for approval. Cannot approve and cannot change setup. |
BOM Change Control Supervisor (GSO BOM Chg Superv) |
Approvers | Everything a User can do, plus approving, rejecting and delegating requests and maintaining substitutes and obsolescence records. |
BOM Change Control Admin (GSO BOM Chg Admin) |
Administrators | Everything a User can do, plus BOM Change Control Setup, approver rules and approver chains. An administrator who also approves needs the Supervisor set as well. |
BOM Change Control Demo Data (GSO BOM Chg Demo) |
Sandboxes only | Runs the volume benchmark that generates bulk test data. Never assign it in production. |
Approvers named in setup, in approver rules or in approver chains must hold the Supervisor set, otherwise they cannot act on the requests routed to them.
Support
For help with BOM Change Control, contact your Business Central partner, or reach GMSOFT through the contact page. Other apps from the same publisher are listed on the apps page, and data handling is described in the privacy statement. The End-User Licence Agreement applies to this app. Support channels and hours are on the support page.
When you report a problem, include your Business Central environment name and version, the page you were on, the worksheet scenario number if there is one, and the exact message text.
Frequently asked questions
I cannot edit my worksheet lines – it says the scenario is pending approval, released or completed. The scenario is deliberately frozen. Cancel the approval request if it is Pending Approval, or choose Reopen if it is Released. A Completed scenario cannot be changed at all, so start a new one.
Where is Submit for Approval on the Production BOM page? It was removed in version 2.0. Approval always starts from a worksheet scenario, so that the request is tied to an exact, reviewable set of changes. Open the BOM with the BOM Worksheet action, make your changes, then submit from there.
My request was rejected but the worksheet is still Pending Approval. A rejection returns the lines to Open automatically. If a request was rejected before this behaviour existed, choose Cancel Approval Request once to unlink the finished request.
Nobody can approve my request, or I get an error about the approver. Check Default Approver ID, the approver rules and the approver chains. Every level needs a user who exists, holds the Supervisor permission set, is not the requestor and differs from the previous level, and chain levels must run 1, 2, 3 without gaps. These problems are reported at submission, never mid-flight.
The approver never got a notification. Approvers are notified by email. Check Send Approval Notifications, Send Email on Approval Request, the approver’s email address and the email account. The banner you see after submitting is a confirmation to you, the sender.
I get “cannot update certified BOM”. Certified BOMs are never modified in place. Create a new version – the worksheet does this for you with Finish and Save → Create New Version.
The rolled-up cost looks wrong. Check the item unit costs and the item units of measure. The explosion converts every line to base units, applies scrap and rolls up children only – a sub-assembly’s own unit cost is not added on top of its children. Run Refresh Warnings on the worksheet to find components without a cost.
Every row of my CAD import failed. Read the error text on the row. Common causes are a missing unit of measure on the item, a blocked item, a part number that would create a loop, and a BOM shared by several items. Fix the data and run Process Import again – only the failed rows are retried.
I get “No. Series … must have a value”. Fill in Config BOM Nos. in BOM Change Control Setup, or Routing Nos. and Production BOM Nos. in Manufacturing Setup.
Approval is suddenly required after installing 2.0. Version 2.0 is secure by default. If your environment relied on the old behaviour, clear Approval Required for BOM Changes in BOM Change Control Setup after installing.
Version Information
| Application | BOM Change Control |
| Version | 2.0.0.0 |
| Publisher | GMSOFT LIMITED |
| Requires | Microsoft Dynamics 365 Business Central online, version 29 or later |
| Edition | Premium – the app builds on the standard manufacturing functionality |
| Dependencies | None beyond the standard Business Central application |
| Target | Cloud |
| Languages | English (United Kingdom), Greek (Greece), Italian (Italy) |
What is new in 2.0
- A new worksheet status, Completed: Finish and Save closes the scenario instead of leaving it Released forever, so a change can never be written twice.
- Approval required is on by default for new installations, for both BOM changes and new BOMs.
- Approver chains of any length, with the full approver sequence resolved, validated and snapshotted on the request at submission – editing a rule later never strands a request in flight.
- The worksheet-less Submit for Approval action on the Production BOM page was removed; approval always starts from a worksheet scenario.
- Where-used and explosion were rewritten on a single shared line resolver, so active-version filtering, unit-of-measure conversion, scrap compounding and cost roll-up now agree across every analysis.
- Reject, cancel and reopen return the worksheet to Open under both approval engines, and delegation refuses the delegating user and anyone who already approved an earlier level.
- Frozen scenarios refuse new lines from every caller, not only from the pages.
- Greek and Italian are shipped complete alongside English (United Kingdom).