Manufacturing · Microsoft Dynamics 365 Business Central
Apps › Manufacturing Suite › Cost Accounting Production Costing
Cost Accounting Production Costing
Take the actual overhead of the period, from the G/L or from Business Central Cost Accounting, absorb it onto your work and machine centres, and close the year with a definitive, reconciled production cost.
✓ Three cost sources, one engine
✓ Preview before anything is posted
✓ Spending and volume variances
✓ Built & supported by GMSOFT
Overview
What Cost Accounting Production Costing does
Business Central puts overhead into product cost through the indirect cost % and overhead rate of each work and machine centre. Somebody has to work out those rates, usually once a year in a spreadsheet, and nobody checks them against the overhead actually spent. Cost Accounting Production Costing does that job every period: it collects the actual overhead, splits it by cost pool and cost centre, absorbs it onto the centres with capacity-based or budget rates, reconciles what was applied with what was spent, and re-costs the whole year at year-end.
Collect
- Three cost sources – G/L account and dimension mapping for any chart of accounts, Business Central Cost Accounting cost entries by cost type, or the Greek Group 6 (ELP) catalogue.
- Cost pools – energy, maintenance, depreciation, indirect labour and the other components you choose, each absorbable or a period cost.
- Cost centres from a dimension – any dimension can say which work or machine centre a cost belongs to.
Absorb and inject
- Allocation bases – machine hours, labour hours, run time, setup and run time, output quantity, setup count, energy, floor area, headcount, fixed % or manual rate.
- Calculated or budget rates – actual rates from the capacity ledger, or normalized rates from a G/L budget.
- Service centres – maintenance or quality costs redistributed onto production centres, direct or reciprocal.
- Two ways in – Mode A writes the native centre overhead rates, so Adjust Cost carries the overhead into item cost; Mode B posts a tagged applied/WIP journal.
Reconcile and close
- Reconciliation – collected against applied per pool, with the over or under-absorption split into spending and volume variance and posted.
- Year-end definitive costing – full-year actual rates, the delta over the provisional runs posted once, and optional item revaluation lines for review.
- Period Close Cockpit – every cost period with its progress and next step, and the close steps run from one place.
- Safe by design – simulation runs that can never be injected, posting preview, reversal of every injection and posting, and cost periods you close as you go.
And also
- Subcontracting cost collected per item and period.
- Cost components visible per item, with APIs for Power BI.
- Setup guide, a Cost Accountant role centre and a job queue routine for the monthly collection.
App details
- Platform: Microsoft Dynamics 365 Business Central online, version 29 or later
- Edition: Premium (works with work and machine centres)
- Requires: No other apps
- Category: Manufacturing, Finance
- Languages: English (US and UK), German, French, Spanish, Italian, Greek
- Optional: Greece companion app for the ELP Group 6 cost source, now on AppSource
- Version: 1.29
- App ID: 59b6fd68-47a1-44ee-b9be-3550c200d488
- Publisher: GMSOFT LIMITED
Book a demo
Read the documentation
How it works
One close, every period
Collect
Actual overhead of the period, from the cost source you chose, into the pools.
Distribute
Service centre costs onto the production centres.
Absorb
Pool × centre rates from capacity or budget.
Inject
Into centre rates or as an applied journal, after a preview.
Reconcile
Applied against actual, variance posted. At year-end, the definitive delta.
IAS 2
Inventory cost the way IAS 2 measures it
IAS 2 Inventories sets how production overhead goes into the cost of what you make. Standard Business Central gives you the fields; the rules are left to you. The table shows what changes with the app.
| IAS 2 | What it requires | Standard Business Central | With Cost Accounting Production Costing |
|---|---|---|---|
| 10, 12 | Production overhead, fixed and variable, is allocated to inventory systematically | Indirect Cost % and Overhead Rate typed on work and machine centres, usually once a year | Actual overhead collected every period into cost pools and absorbed onto centres by rate × volume |
| 12 | Variable overhead follows actual use of the facilities | No split between fixed and variable overhead | Each pool is Fixed or Variable; variable pools absorb actual cost over actual volume |
| 13 | Fixed overhead is allocated on normal capacity | No normal capacity; the same rate applies whatever the volume | Fixed rate = actual cost ÷ the greater of actual volume and normal capacity for the period |
| 13 | Unallocated fixed overhead (idle capacity) is expensed | Idle-capacity cost stays in item cost or is adjusted by hand | Shown as capacity variance and posted to a P&L variance account by the reconciliation |
| 13 | At abnormally high volume, cost per unit falls so inventory is never above cost | Fixed rates can over-absorb | Above normal capacity the rate drops; never more than actual cost is absorbed |
| 16 | Administrative, selling and storage costs are excluded | Depends on how the rates were worked out in the spreadsheet | Period-cost pools and non-production cost centres are never absorbed; they are expensed |
| 21 | Standard cost only if it approximates actual and is reviewed regularly | Standard costs updated by hand; variances not explained per overhead pool | Budget rates during the year, reconciliation every month, year-end definitive run on actual cost |
| 23–27 | Cost formulas: FIFO or weighted average | Native costing methods | Unchanged: absorbed overhead flows through Adjust Cost – Item Entries |
| 9, 28–32 | Lower of cost and net realisable value, item by item | No NRV review; write-downs through a manual revaluation journal | Net Realisable Value Review proposes write-downs per item and creates the revaluation journal |
| 33 | Reversal of an earlier write-down when NRV rises | Manual | Manual, through a revaluation journal (not automated) |
| 36 | Disclosures | Not produced | Not produced; runs and reconciliations give the supporting figures per pool and period |
The app calculates inventory cost of conversion in line with IAS 2: fixed production overheads on normal capacity, unallocated overheads expensed, non-production costs excluded. Compliance with IFRS depends on correct configuration and remains the responsibility of the reporting entity. This is the publisher’s mapping, not an audit opinion.
Roles
Made for the cost accountant
The app has one permission set and one role centre, for the people who run the period close. Planners and operators keep working as usual: the overhead reaches item cost through standard Business Central costing.
Cost accountant
CA Production Costing
- Setup, pools and mappings
- Collect, absorb, inject and reconcile
- Period Close Cockpit and cost periods
- Year-end definitive costing
Screenshots
See it in action




Want to see your own overhead absorbed?
We will load one month of your expenses, absorb it onto your centres and show you the rates and the variance against what you use today.
Frequently Asked Questions
Before you install
Q: Which Business Central do I need?
A: Business Central online, version 29 or later, Premium edition, with work or machine centres and production orders.
Q: Do I need the Cost Accounting module?
A: No. It is one of the three cost sources. You can collect from G/L accounts and dimensions instead, with any chart of accounts.
Q: Which costing method should my items use?
A: Average costing with a monthly average cost period works best, especially with multi-level BOMs. The setup page has a check for it.
Day to day
Q: Will it post anything without me seeing it first?
A: No. Calculating a run changes nothing. Postings can be previewed first, every injection and posting can be reversed, and simulation runs can never be injected.
Q: What is the difference between Mode A and Mode B?
A: Mode A writes the overhead rates on the centres, so standard Adjust Cost puts the overhead into item cost. Mode B leaves the rates alone and posts a tagged applied/WIP journal instead.
Support
Q: How do I get help?
A: See the documentation, or contact support.
Download the one-page datasheet
Enter your details and get the Cost Accounting Production Costing datasheet as a PDF.
We use your details only to send you information about GMSOFT apps. See our privacy statement.