Manufacturing · Microsoft Dynamics 365 Business Central · On Microsoft AppSource
Apps › Manufacturing Suite › Production Maintenance Management
Production Maintenance Management
Maintain every machine and appliance, keep track of the inspections and certificates the law asks for in your country, and let planned downtime reduce capacity in Business Central planning.
✓ Maintenance linked to work and machine centres
✓ Certificates tracked per country
✓ Warnings, never blocks
✓ Built & supported by GMSOFT
Overview
What Production Maintenance Management does
Maintenance in a plant has two sides. One is keeping machines running. The other is proving to an inspector that lifting gear, pressure vessels, electrical installations and the like were examined on time. Production Maintenance Management handles both inside Business Central, and connects them to the production plan.
Preventive maintenance that runs itself
- Time, counter or condition – plan by calendar, by operating hours, cycles or units produced, whichever comes first, or when a reading passes a limit.
- Work orders created ahead – the job queue creates them with checklists, parts and labour from task templates. A yearly service can absorb the monthly check due in the same week.
- PM forecast – the jobs due in the next 12 months, per equipment.
Work orders technicians can finish
- My Work Orders – each technician sees their released jobs, on the phone too, and starts and completes them there.
- Checklists, downtime and failure codes – mandatory steps, downtime per stop, and failure, cause and remedy codes based on ISO 14224.
- Spare parts from inventory – availability checked before the work starts; short parts go to the requisition worksheet and external work to a purchase order.
- Cost where it belongs – parts are posted from inventory and labour to resources, and with fixed asset integration on, the cost also reaches the fixed asset.
Statutory inspections and certificates
- Rule sets per country – UK, EU, Greece, Cyprus, Italy, Germany and France, each with its source, owner and review date. You adapt them; they are guidance, not legal advice.
- Inspection schedule – built from the equipment category and its site, with valid, due soon, overdue, missing and defect status.
- Certificates – result, expiry, defects with repair due dates and the attached report. A defect creates a repair order.
- Warnings, never blocks – overdue or missing certificates show on the role center and when a production order is released, and a certificate register prints for auditors and insurers.
Maintenance and production together (Premium)
- Downtime in capacity – maintenance and inspection windows reduce the capacity of the work or machine center, so planning works around them.
- Counters from production – posted run time advances the operating hours of the equipment.
- Works on Essentials too – with manufacturing integration off, the app reads no manufacturing data.
Know where you stand
- Equipment KPIs – availability, MTBF, MTTR, PM compliance, planned work share, downtime cost and certificate compliance.
- Reports and APIs – open work orders, downtime per work center, maintenance cost per equipment, and API pages for Power BI.
An assisted setup suggests the inspection rules for your country, creates sample data for a UK and a Greek plant, and prepares Excel templates for your equipment, plans and certificates.

App details
- Platform: Microsoft Dynamics 365 Business Central online, version 29 or later
- Edition: Essentials or Premium (production integration needs Premium)
- Requires: No other apps
- Category: Manufacturing, Maintenance
- Languages: English (US and UK), German, French, Spanish, Italian, Greek
- Pricing: Paid plan on AppSource
- Version: 1.29
- App ID: ee4bf6a9-5129-4490-92df-32af84e215f7
- Publisher: GMSOFT LIMITED
Book a demo
Read the documentation
Inspection bodies and rules
Set up for your country, and change it when the rules change
The app ships with a starting list per country. Rules and bodies change, and some are specific to a site or an insurer, so every row can be edited, added or removed by you. The list is a starting point, not legal advice.
| Country | Main rules (starting list) | Typical inspection bodies (starting list) |
|---|---|---|
| United Kingdom | LOLER 1998 (lifting equipment), PSSR 2000 (pressure systems), PUWER 1998, Electricity at Work Regulations 1989 | Engineering inspection services of insurers and independent inspectors, for example HSB (Munich Re), Allianz, Zurich, Bureau Veritas |
| European Union | Work Equipment Directive 2009/104/EC, Pressure Equipment Directive 2014/68/EU, Machinery Regulation (EU) 2023/1230 | Notified bodies listed in the European Commission NANDO database |
| Greece | National rules implementing the EU directives, periodic inspection of lifting and pressure equipment | Accredited inspection bodies, for example TÜV NORD Hellas, TÜV Austria Hellas, DEI inspection body |
| Cyprus | National work equipment, lifting and pressure rules, Department of Labour Inspection | For example TÜV NORD Cyprus, CyCert |
| Italy | D.Lgs. 81/2008 and D.M. 11 April 2011 (periodic verification of work equipment) | INAIL, ASL/ARPA and authorised private bodies, for example TÜV SÜD Italia |
| Germany | Betriebssicherheitsverordnung (BetrSichV) | Approved inspection bodies (ZÜS) listed by BAuA, for example TÜV and DEKRA |
| France | Code du travail and the decrees on periodic checks of work equipment | Approved bodies, for example APAVE, Socotec, Bureau Veritas |
Further countries are added on request. Check the current rules and the approval of any body with the authority in your country before relying on this list.
How it works
From register to plan in five steps
Register
Add machines and appliances, link production machines to their centre.
Choose country rules
Pick the rule set and bodies for the site, and adjust them.
Record certificates
Enter number, body, dates and attach the document.
Get early notice
An inspection order appears before the certificate expires.
Plan with real capacity
Downtime reduces centre capacity in planning.
Want to see it on your own equipment?
Tell us which machines and inspections you manage today, and in which country. We will show you the register, the certificates and the effect on capacity.
Frequently Asked Questions
Q: Does an expired certificate stop production?
A: No. The app shows a warning only. The decision stays with you.
Q: Can I change the list of inspection bodies and rules?
A: Yes. Both are tables you maintain: add, change or remove rows for your country and your insurer.
Q: How does downtime reach planning?
A: Maintenance, inspections and breakdowns reduce the available capacity of the work or machine centre, so Business Central planning and capacity load take it into account.
Q: Is the country list legal advice?
A: No. It is a starting list. Confirm current rules and approved bodies with the authority in your country.
Q: When is it available?
A: Now. It is live on Microsoft AppSource for Business Central online, version 29 or later. Get it on AppSource or book a demo.
Q: Which Business Central edition do I need?
A: Essentials or Premium. The link with production orders, capacity and counters from posted output needs Premium; with it switched off, the app works on Essentials.